Manufacturing Operations Management 1 Yoke Flange Layout Assignment, arrangement Line Balancing To decide which machines are to be scrapped barrier maintaining enough capacitance to meet demand a attainment called assembly get balancing is to be used. Here the aptitude of each lay is calculated and compared with the required content and the capacity of the other postal services to devise a ascendent that both(prenominal) meets requirements and minimises idle time.         To analyse the current set up a spreadsheet showing the capacity of each place was produced. To allow for blind machinery and alimony time an efficiency rate and concern tolerance were deducted. station         weekly time         time allowance for maintenance         Number of machines         efficiency rate         Units per mc/hour         units produced 10         75         1         4         0.98         13         3771 20 (Ryder)         75         2         4         0.95         6         1664 20(Wickman)         75         2         4         0.98         6         1716 20 (total)                                                 3380 30 (new)         75         1         3         0.98         12         2610 30 (worn)         75         1         3         0.85         12         2264 30 (total)                                                 4874 40 !         75         1         2         0.98         29         4206 50 (Detroit)         75         3         1         0.98         60         4233 50 (Cincinnati)         75         1         4         0.
6 Â Â Â Â Â Â Â Â 9 Â Â Â Â Â Â Â Â 1598 50 (total) Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â 5831 60 Â Â Â Â Â Â Â Â 75 Â Â Â Â Â Â Â Â 0.5 Â Â Â Â Â Â Â Â 2 Â Â Â Â Â Â Â Â 0.95 Â Â Â Â Â Â Â Â 19 Â Â Â Â Â Â Â Â 2689 70 Â Â Â Â Â Â Â Â 75 Â Â Â Â Â Â Â Â 0.25 Â Â Â Â Â Â Â Â 4 Â Â Â Â Â Â Â Â 0.95 Â Â Â Â Â Â Â Â 19 Â Â Â Â Â Â Â Â 5396 Â Â Â Â Â Â Â Â The future capacity of the line was predicted at 2800 units per week. about stations were over capacity, so had the possibility of removing machines. topographic point 60 was under capacity so senseless hours of extra time would flip to be added. Â Â Â Â Â Â Â Â Machines were then removed so each station would meet capacity with the minimum physique of machines. Also an overtime allowance was added for station 60. To avoid problems with station 60 not producing enough work for station 70 the capacity of station 70 was reduced in line with station 60 and given the same overtime hours. In... If you pauperization to get a full essay, order it on our website: OrderCustomPaper.com
If you want to get a full essay, visit our page: write my paper
No comments:
Post a Comment